Project Content????
Our company took the electric design, installation, debugging and accompany production task of VW370CN & AU37xCN under-section in the welding workshop of FAW-VW Foshan 4th factory, a total of 17 sets of PLC, 109 robots, PLC and robots are all fit for the new standard of FAW-VW, the difficulty of debugging is higher than ever before. Electrical parts of the project was entered into the factory in 2012 and ended in July 2014.

????Process Ability
It mainly includes the process of automatic welding, stud welding, online measurement, gripping and dropping, CMT, gluing…etc.

Car Body Production Line

The area of under-section II, it mainly includes the process of automatic welding, stud welding, online measurement.

The area of front floor, it mainly includes the process of automatic welding, stud welding, gluing…etc.

The area of rear floor, it mainly includes the process of automatic welding, stud welding, gluing, CMT…etc.