Geely DaJiangDong SX12 Welding Body Side Line Project -- Responsible for the design, manufacturing, processing, installation and commissioning, after-sales service of the project. There are 33 robots on the whole line, and the working cycle time is less than or equal to 88S. Reserve the capacity of a double sided car model and a single side car model.
The picture shows is a single side.
